Draft Alberta Protocols Currently Under Public Review
Public Review for the Draft
Quantification Protocol for the Capture of CO2 and Permanent Storage in Deep
Saline Aquifers
Public Review Period is Complete
The
opportunity for generating carbon offsets with this protocol arises from the
direct disposal of CO2 from a previous source of emissions, into deep saline
aquifers for permanent storage. This protocol scope covers the full carbon
capture and storage chain from capture through compression, transport,
injection and storage. The source of CO2 is from an industrial facility that
operates a primary process, and the carbon capture facility applies a capture
technology that uses chemical solvents.
Written public comments were accepted between December 12, 2011
to January 12, 2012.
Draft
Quantification Protocol for the Capture of CO2 and Storage in Deep Saline
Aquifers - Public Comment Version
Technical
Seed Document for the Capture of CO2 and Permanent Storage in Deep Saline
Aquifer Protocol*Note - comments will only be accepted on
the draft protocol and not the supporting document.
Technical
Review Minutes for the Capture of CO2 and Permanent Storage in Deep Saline
Aquifer Protocol
Conservation
Cropping Quantification Protocol Public Review
Public Review Period for the
Conservation Cropping Quantification Protocol (formerly Tillage Management
Quantification Protocol) is Complete
Protocol
Approved and Posted.
A
five year review of the Tillage Management Quantification Protocol was undertaken
by Government and is now complete. Main changes and updates to this protocol
include: baseline adjustments to reflect increased adoption levels of tillage
practices, new opportunities to quantify carbon offsets by reducing
summerfallow, and increased requirements for proof of practice change. The
results are incorporated into a new Conservation Cropping Protocol.
Written public comments were accepted between October 25, 2011
to November 25, 2012.
Conservation Cropping Quantification Protocol - Draft Public
Comment Version
Full Appendix D Sample Calculation for Conservation Cropping
- Draft Public Comment Version
Selection for
Residual Feed Intake in Beef Cattle Quantification Protocol Public Review
Additional Public Review Period for the Residual Feed Intake
Quantification Protocol is Complete
Protocol
Approved and Posted.
Following
the closing of the first public comment period in early 2010, additional work
was conducted on this protocol to address submitted comments from stakeholders,
a government review, and update the draft for modifications that occurred in
the protocol development process. Alberta Environment has requested this protocol
complete an additional public posting period to ensure stakeholders review this
finalized draft protocol.
Selection for Residual Feed Intake in Beef Cattle
Quantification Protocol - Draft Public Comment Version
Written public comments were accepted between October 25, 2011
to November 25, 2012.
Solution Gas
Conservation Quantification Protocol Public Review
Additional Public Review Period for the Solution Gas
Conservation Quantification Protocol is Complete
Protocol
Approved and Posted.
Following
the closing of the public comment period - 5th Cycle Protocol Development in
2009/2010, additional review was conducted on this protocol to address
submitted comments from stakeholders, internal government reviews, and update
the draft for modifications that occurred in the protocol development process.
Alberta Environment has requested this protocol complete an additional public
posting period to ensure stakeholders review this finalized draft protocol.
Solutions Gas Conservation Quantification Protocol - Draft
Public Comment Version
Written public comments were accepted between October 25, 2011
to November 25, 2012.
Conversion of
Drilling Rigs from Diesel-Electric to High-line Electricity Sources
Quantification Protocol Public Review
Public Review and Comment Period for the Conversion of Drilling
Rigs Quantification Protocol
Protocol
Approved and Posted.
Following
the Protocol Development process in the 2010/2011 year, this protocol completed
the stakeholder review and underwent an internal government review. The
government review was finalized and the protocol was posted for public comment.
Conversion of Drilling Rigs from Diesel-Electric to
High-line Electricity Sources Quantification Protocol - Draft Public Comment
Version
Written public comments were accepted between October 25, 2011
to November 25, 2011.
Alberta Offset
System - Direct Reduction in Forest Harvesting Practices Protocol Public Review
(May 2011)
The
In Block Chipping Protocol completed the 1st and 2nd Rounds of Technical and
Stakeholder review with no sustained objection. The protocol addressed all
suggestions/comments from the Stakeholder review session and made any necessary
revisions. The protocol then entered the public review posting. Please refer to
the 6th
Cycle Protocol Development page for additional information on the protocol
including its development and versions.
QUANTIFICATION PROTOCOL FOR DIRECT REDUCTIONS IN GREENHOUSE GAS
EMISSIONS ARISING FROM CHANGES IN FOREST HARVESTING PRACTICES
Additional
Review Period for Alberta Bovine Protocols (May 2011)
Following
internal government assessment and review of the original approved protocols,
additional work was conducted on this protocol to provide clarity and further
transparency for the requirements of projects applicable under these protocols.
The following draft protocols were posted for an additional Public Review
Period:
|